GS Inima, together with GS E&C, will develop the first large-capacity desalination plant in South Korea. On September 10, 2021, K-Water, Korea Water Resources Corporation, has selected GS Inima, through its parent company GS E&C, for the Engineering,...
The project has a duration of 3 years and includes the sewage and rainwater pumping stations of more than 20 towns. Inima reinforces his position as specialist in the treatment and integral management of water with a new award for the operation service of Aljarafesa...
It is a facility with a treatment capacity of 41.274 m3/day for 148.000 equivalent inhabitants, which includes anaerobic digestion and energy recovery. The Board of Directors of Sociedad Mercantil Estado Aguas de las Cuencas de España (ACUAES) in a session held by its...
In the elections held on February 1, Mr. Antonio Ordóñez Director of R&D&i and Mr. Carlos Torroja Commercial Director CSR have been re-elected as members of the Board of Directors of the Spanish Association of Desalination and Reuse (AEDyR) for the next two...
These are two seawater desalination plants, Ghubrah III with a flow of 300.000 m3/day and Barka V with a flow of 100.000 m3/day. GS Inima will finance, design, build and operate both projects for 20 years, which means for the company a portfolio of more than 2.000...
The Contracting Committee of the General Directorate of Water of the Ministry for the Ecological Transition (MITECO) held on October 28, 2020 has awarded the joint venture VIAS Y CONSTRUCCIONES, SA (50%) – GS INIMA ENVIRONMENT, SA (50%) the contract for...